Event Merchandise Planning Timeline: How to Not Miss Your Deadline
A music festival, marathon, or major conference has one date and it doesn't move. Here's a realistic production timeline for large-scale event merchandise — and what happens when you compress it.
Event merchandise is uniquely unforgiving. A retail brand can delay a seasonal product launch. A corporate program can push back a distribution date. An event — a music festival, a marathon, a conference — cannot move. The date is the date.
For large-scale event merchandise at 100,000+ units, that reality demands backward planning from the delivery date, with every production stage mapped explicitly. Here’s what a realistic timeline looks like.
The Full Timeline: Working Backward from Your Event
For a 100,000-unit screen print order (standard garments, 2–3 colors, US production and delivery):
| Stage | Duration | Notes |
|---|---|---|
| Quote and contract | 2–5 days | Faster if your specs are ready |
| Artwork approval | 3–7 days | Depends on art readiness and revision cycles |
| Blanks sourcing and receiving | 7–21 days | Highly variable — see below |
| Production | 10–20 business days | Depends on complexity and quantity |
| QC and packing | 3–5 days | |
| Freight to venue/warehouse | 2–7 days | Domestic ground; expedited available |
| Total (realistic) | 6–10 weeks | From signed contract to delivered goods |
Working backward: if your event is October 15, you should be contracted and submitting artwork no later than August 1 — ideally mid-July for comfortable margin.
The Stage That Surprises People Most: Blanks
Garment availability is the most unpredictable element of large event merchandise runs. A specific style, color, and size breakdown at 100,000 units isn’t always sitting on a distributor’s shelf. If it needs to be back-ordered from a mill or consolidated from multiple warehouses, receiving can take 3–4 weeks instead of 1.
Strategies to reduce blanks risk:
Confirm availability at quote time. Any competent manufacturer will check stock on your specific garments when quoting. If the style you want has tight availability, they should flag it immediately.
Choose popular, well-stocked styles. For event merchandise where quality and brand standards allow flexibility, styles with deep stock (Gildan 5000, Bella+Canvas 3001, etc.) carry less availability risk than specialty styles.
Have a backup style ready. Know in advance what your second choice is if the primary style isn’t available. Decision delays when blanks come up short are costly.
Order blanks early if possible. For very large events with a hard budget, purchasing blanks against a purchase order before artwork is fully finalized reduces timeline risk. Decoration can’t start until art is approved, but blanks can be received and ready.
Artwork: The Other Common Delay
The single most common cause of event merchandise delays is artwork that isn’t production-ready. See our artwork preparation guide for a full breakdown, but the short version:
- Vector files, not raster
- Pantone colors specified, not hex or CMYK
- Fonts outlined
- Color count confirmed and realistic for screen printing
Art delays that feel like “a day or two” often compound into a week when revisions go back and forth. Get production-ready art submitted on day one.
Rush Orders: What’s Actually Possible
If you’re reading this six weeks before your event with 80,000 units to produce, the question is whether it’s possible, not just what it costs.
US-based production is the only realistic option. Overseas production timelines don’t compress to six weeks including transit.
Rush production is available but expensive. Compressing a 15-day production run to 8–10 days requires overtime, prioritized scheduling, and production capacity that may or may not be available. Expect a 20–40% rush premium, and confirm capacity before assuming it’s available.
Freight options. Ground freight can be replaced with air freight to recover 3–5 days. This adds meaningful cost on a large shipment.
Quantity flexibility matters. If you need 100,000 units by a hard date that isn’t achievable, could you work with 70,000? Reducing quantity reduces production time. An initial shipment to cover opening inventory, with a second run for replenishment, may be the right structure.
The Best Time to Start Planning
For events of 100,000+ units:
- 6+ months out: Comfortable. No rush premiums, full flexibility on garment selection, time for pre-production samples.
- 3–4 months out: Manageable. Still enough time for standard production, but no significant slippage in artwork approval or blanks.
- 6–8 weeks out: Tight but possible with US production. Rush premiums likely. Very little room for delays at any stage.
- Under 6 weeks: Difficult. Have a frank conversation with your manufacturer about what’s actually achievable.
The earlier you start, the lower your cost and the less stress on every stage of production.